Click on a photo to enlarge.
This homeowner contacted us becuase of our A+ rating with the Better Busines Bureau. We went to their home and provided a free estimate. After careful consideration, the homeowner chose Roof Roof to replace his roof. We began the project by removing the existing roof down to the wood deck. We also removed the chimney per the homeowners request. We then installed felt paper across the field of the roof and ice and water shield in the valleys. We installed Owens Corning starter, ProEdge cap, and Duration Onyx black shingles. We finished the roof with the Owens Corning ridge vent. The process took one day to complete.
On this roof replacement, we removed the existing shingles down to the wood deck. All of the rotten wood was replaced. 15lb felt covered the field of the roof and an ice and water shield was installed in the valleys. The homeowner chose Owens Corning Oakridge shingles in the color Onyx Black. We reflashed the chimney and replaced all of the PVC plumbing boots. The roof was finished off with a new ridge vent. The project took one day to complete.
This roof was damaged by high winds during a recent storm and was approved by the insurance company for replacement. We removed the old roof and installed a new Oakridge Driftwood 110mph wind resistant shingle, with synthetic underlayment and the roof looks great!
This homeowner had hail damage to their home. We removed the existing roof and installed new Owens Corning ProArmor synthetic underlayment, Owens Corning ice and water shield, and Owens Corning Duration Williamsburg Gray shingles. We finished it off with Owens Corning ridge vent to help control the heat and moisture in the attic. The project took one day to complete.
The shingles on this homeowner's house were damaged from the March 2017 hail storm. Roof Roof was contracted to replace the roof and we started the project within two weeks. We began by removing the old roof and changing out rotten decking. We installed ice and water shield around the roof penetrations and walls. We then installed new underlayment and Owens Corning Duration Driftwood shingles. We finished off the roof with a new Owens Corning ridge vent to help alleviate heat and moisture built up inside the attic. The project took one day to complete.
our service area