This homeowner had hail damage to their home. We removed the existing roof and installed new Owens Corning ProArmor synthetic underlayment, Owens Corning ice and water shield, and Owens Corning Duration Williamsburg Gray shingles. We finished it off with Owens Corning ridge vent to help control the heat and moisture in the attic. The project took one day to complete.
The shingles on this homeowner's house were damaged from the March 2017 hail storm. Roof Roof was contracted to replace the roof and we started the project within two weeks. We began by removing the old roof and changing out rotten decking. We installed ice and water shield around the roof penetrations and walls. We then installed new underlayment and Owens Corning Duration Driftwood shingles. We finished off the roof with a new Owens Corning ridge vent to help alleviate heat and moisture built up inside the attic. The project took one day to complete.
Affected by the March 2017 hail storm, this homeowner chose Roof Roof to fix the damages. We removed the existing roof and installed Owens Corning Oakridge Driftwood shingles. Starter shingle was installed around the perimeter and hip and ridge shingles were installed on top of the ridge vent. The roof took one day to complete.
This Clinton home had an old roof that needed to be replaced. The customer chose Owen's Corning Supreme 3-Tab shingles in Williamsburg Grey for the replacement.
This homeowner researched roofing companies online and contacted Roof Roof after reading about our customer experience and ratings. After installation, the roof has Owen's Corning Duration Shingles in Driftwood, topped off with ridge vent for attic ventilation.
our service area